Honeywell AlarmNet Total Connect 2.0 Chip Upgrade Installation Manual and Setup Guide



Related Products

Honeywell GSMV-TC2 - AlarmNet Total Connect 2.0 Upgrade Kit
Honeywell GSMV-TC2
AlarmNet Total Connect 2.0 Upgrade Kit
Honeywell GSMX-TC2 - AlarmNet Total Connect 2.0 Upgrade Kit
Honeywell GSMX-TC2
AlarmNet Total Connect 2.0 Upgrade Kit
Honeywell iGSMV-TC2 - AlarmNet Total Connect 2.0 Upgrade Kit
Honeywell iGSMV-TC2
AlarmNet Total Connect 2.0 Upgrade Kit
Cropped Honeywell Vista 15P PROM Chip for a VISTA 15P Upgrade
Honeywell Vista 15P PROM
Upgrade chip for the VISTA 15P
List Price:
Our Price: $25.99
Honeywell Vista 20P PROM - Upgrade chip for the VISTA 20P
Honeywell Vista 20P PROM
Upgrade chip for the VISTA 20P
List Price:
Our Price: $25.99

Document Transcript

UPGRADE INSTALLATION NOTICE
Use this procedure to replace the control panel micro-controller chip (PROM) with an upgraded version. 1. Remove all power (battery first, then AC) from the Control Panel.

2. To guard against static discharge damage during the upgrade process, briefly touch a chassis ground point in the Control Panel cabinet to discharge any static buildup.
Avoid performing this replacement while standing on a carpeted floor. Performing this replacement on a carpeted floor increases the possibility of static buildup. 3. Locate the existing PROM and note its orientation (beveled edge at bottom, angled corner at bottom-right).
PROM LOCATION (SEE DETAILS A & B)

DETAIL B PROM INSTALLATION
BEVELED EDGE

CONTROL PANEL
1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 25

PRO

M

DETAIL A PROM REMOVAL

SOCKET ARROW

ANGLED CORNER

ORIENT BEVELED EDGE TOWARDS SOCKET ARROW

PROM

PAPER CLIP

1. PLACE PAPER CLIP IN EITHER SLOTTED CORNER OF PROM. 2. PRY PROM UP AND REMOVE.

ANGLED CORNER

ANGLED CORNER

PROPER ORIENTATION FOR SOCKET
PROMUPGRADE-001-V1

4. Using a paper clip (or something similar, such as a pin), carefully remove the PROM by slowly prying it out of its socket. The upper right and lower left socket corners have openings for this purpose (see Detail A). 5. While noting the PROM’s orientation, carefully place the new PROM into the empty socket. Line up the pins and press straight down until the PROM is seated firmly (see Detail B). 6. Power up the control panel as follows: • Reconnect AC power to the Control Panel, then... • Reconnect the battery to the Control Panel’s battery terminals. 7. After power up, test the system for proper operation. Reset the system date and time, and confirm test report times (if previously programmed) to be sure reports are transmitted at the desired time of day.

¬.Hl
K4948-5 1/03


Uploaded